International airport · Arlington, Virginia, United States

Ronald Reagan Washington National Airport

Ronald Reagan Washington National Airport (DCA) is a commercial airport in Virginia with two terminals, 58 gates and nearly 100 shops and restaurants.

About Ronald Reagan Washington National Airport

An airport on the Potomac

Ronald Reagan Washington National Airport, known by its designator DCA, is a commercial airport situated in the Commonwealth of Virginia on a site of 860 acres, of which 733 are land and 127 are underwater. It operates as a short-haul airport and is managed by airport manager Terrence Liercke.

Terminals and gates

The airport has 58 gates in total: 9 in Terminal 1 and 49 in Terminal 2. Terminal 1, formerly Terminal A, opened in 1941 with a facility of 115,000 square feet. It was expanded in November 1950 with a 297-foot extension to the south end of the Main Terminal, adding 25,110 square feet, and in 1955 a 587 x 17 foot south finger added 9,979 square feet and new aircraft gates and loading positions. The North Terminal opened in October 1958 with 7,264 additional square feet, and in 1961 the 772-foot passageway between the Main and North Terminals was enclosed.

Terminal 2, formerly Terminal B/C, opened on July 27, 1997. It has 1 million square feet over three levels, with direct connections to Metrorail and the public parking garages via two enclosed pedestrian bridges. Its two-level roadway system separates arriving and departing traffic, and it provides 100 ticket counters, 12 baggage claims, four piers with airline gates and a connector to Terminal 1.

New concourse and security checkpoints

A 225,000-square-foot New Concourse with 14 gates opened to passengers in April 2021, marking the permanent closure of Gate 35X and its busing operation. American Airlines moved its regional flights to the new gates. In November 2021, two new 50,000-square-foot security checkpoint buildings opened; after clearing them, passengers can move between gate areas without being re-screened, and the reconfiguration expands access to shopping, dining and seating options.

Runways

The airfield originally had four runways. The east-west runway was closed in 1956 and is used as a taxiway and for aircraft parking. Today there are three runways: Runway 1/19, the main north-south runway, at 7,169 feet, resurfaced and extended in 2012 to increase the runway safety area; Runway 15/33 at 5,204 feet; and Runway 4/22 at 5,000 feet.

Parking and ground access

Public parking accommodates more than 8,500 vehicles with hourly, daily and economy options. Terminal 1 is served by a five-level parking garage connected to the terminal that includes rental car facilities, and Terminal 2 by a garage connected at both ends. Courtesy shuttle buses run between both terminals and the Economy Lot. On average more than 3,000 taxicabs are dispatched daily, and seven car rental companies operate on-airport with two more off-airport.

Signature Flight Support serves as the Fixed Base Operator for general aviation, with 31,000 square feet of terminal, administrative and office space in Hangar 7 at the south end of the airport. General aviation returned to Reagan National in October 2005, for the first time since September 11, 2001, under new restrictions.

Shops and restaurants

The terminals house nearly 100 shops and restaurants, a mix of national, local and regional retail and food concessions. Fraport USA manages the concessions program at DCA and at IAD and handles guest enquiries about it, including requests for receipt copies from Terminal 1 and Terminal 2 shopping and dining concessions.

Noise and operations

Aircraft noise regulations were in place before commercial jet operations began. Flight patterns follow the Potomac or Anacostia rivers, pilots practice power thrust reduction on takeoff to reduce noise, and nighttime noise requirements apply from 10 p.m. to 7 a.m. The airport also operates under slot and perimeter rules as a primarily short-haul facility.

Passenger history

National Airport served 344,257 passengers in its opening year, 1941, and reached 1 million annual passengers in 1946. Record passenger growth later drove the concourse and checkpoint projects.

In brief

Commercial airport and aviation hub

Photos

Select a photo to enlarge it.